Weekly Construction Update - Friday, October 10, 2025

DATE: Friday, October 10, 2025

SPECIAL ANNOUNCEMENT: Blasting activities are scheduled to begin on Thursday, October 16, and continue through the end of November, taking place along U.S. Route 2/7 (U.S. 2/7) between South Park Drive and Mountain View Drive within the project limits. Blasting activities will begin along U.S. 2/7 and Mountain View Drive near the CVS Pharmacy and the Interstate 89 (I-89) northbound on-ramp. Blasting events will be restricted to weekdays during daytime hours, with crews off the roadway by 3 PM. Up to two blasting events will take place each day. This work is weather-dependent. To learn more about drilling and blasting activities, click here.

TRAFFIC IMPACT AND DURATION: In observance of Indigenous Peoples’ Day, crews will be working outside of the roadway on Monday, October 13.

From Tuesday, October 14, through Friday, October 17, between 6 AM and 3 PM, U.S. 2/7 between Mountain View Drive and the I-89 northbound on-ramp, near the CVS Pharmacy, will be under lane closures and lane reductions. Lane width reductions may be in place along the Interstate 89 (I-89) southbound on-ramp. The on-ramp will remain open. Early next week, there will be lane shifts on Lower Mountain View Drive that will be in effect with traffic maintained. Starting midweek, there will be lane shifts along U.S. 2/7 between Hercules Drive and Champlain Drive. On Thursday, October 16, and Friday, October 17, U.S. 2/7 between South Park Drive and Mountain View Drive and all intersecting sideroads will be shut down for approximately 10 minutes and rolling road blocks will be initiated on the I-89 between Exits 14 and 17 for each blasting event. To learn more about traffic impacts associated with blasting activities, click here.

Motorists should expect significant delays when traveling through the work zone and along adjacent roadways. Please plan ahead, leaving plenty of additional time to get to and from your destination. Whenever possible, consider alternate routes or other forms of transportation such as carpooling, ridesharing, transit, biking, or walking. Drivers should slow down, use caution, and follow flaggers and road signs.

CONSTRUCTION ACTIVITIES: Next week, crews will continue drainage work that will take place for the dry ponds being constructed on the east side of U.S. 2/7 near the I-89 southbound on-ramp. Crews will continue to install drainage infrastructure along Lower Mountain View Drive early next week before shifting to U.S. 2/7 between Hercules Drive and Champlain Drive. Blasting events will take place on Thursday, October 16, and Friday, October 17, along U.S. 2/7 between Mountain View Drive and the I-89 northbound on-ramp, near the CVS Pharmacy.

Dry pond construction on the east side of U.S. 2/7 near the I-89 southbound on-ramp.

Click here for the full Construction Update

Nearby Construction Project Highlights:

Colchester Exit 17 Project

  • Project Area: I-89 Exit 17, U.S. 7 between the Shell Gas Station and Wiley Road, U.S. 2 between Chimney Corner and Jasper Mine Road
  • Next week: Crews will conduct nighttime paving operations (weather permitting) on I-89 northbound, Exit 17 northbound off-ramp, U.S. 2, and U.S. 7. Daytime work will include traffic signal wiring and signage installation on U.S. 2 and U.S. 7.
  • Traffic Impacts:
    • Sunday – Friday, 7 PM – 6 AM | I-89 Exit 17 northbound off-ramp closure, with traffic detoured to Exit 18 in Milton. I-89 northbound lane reduction near Exit 17. Single-lane closures with alternating one-way traffic on U.S. 2 and U.S. 7.
    • Monday – Friday, 6 AM – 7 PM | Shoulder closure on U.S. 7 near Chimney Corner intersection; two-way traffic maintained.
  • Construction: Spring 2024 - Summer 2026
  • Project Website

City of Winooski Project – Main Street Revitalization

  • Project Area: Main Street in Winooski, between the railroad bridge near Maple Street and the Colchester town line near Checkerbay Carwash
  • Next week: Crews will install permanent pavement markings on Main Street between Maple and Stevens Streets, install streetlights between Spring and Stevens Streets, install curb between Lafountain and Bellevue Streets, and continue conduit work on Tigan Street between Weaver and Main Streets.
  • Traffic Impacts: Monday – Friday, 7 AM to 7 PM | Main Street restricted to northbound traffic only; Southbound traffic detoured to Tigan Street and Weaver Street. Intermittent side street closures on Main Street between Maple and Stevens Streets. Tigan Street restricted to westbound traffic only between Weaver and Main Streets.
  • Construction: Spring 2024 – Summer 2026